This page shows how long we were on site for a selection of our projects, and how much floor area each one added.
All 24 projects. Time on site: 8 weeks to 10 months. Floor area: 6 to 186 m².
| Photograph | Project | Scope | Time on site | Floor area added |
|---|---|---|---|---|
| Rowan CloseFarnborough, Hampshire | Whole-house refurbishmentFirst Floor Extension & Full Refurbishment Throughout | 7 months | Area not recorded | |
| Minster RoadGodalming, Surrey | New buildContemporary New Build: 4 bedroom Detached, Eco-Friendly Two Storey Chalet Bungalow | 24 weeks | 180 m²whole house | |
| The StreetShalford, Surrey | Extension2 storey side extension and rear extension | 16 weeks | 51 m² | |
| Montgomery AvenueEsher, Surrey | ExtensionSingle storey rear extension creating an open plan living space | 12 weeks | 40 m² | |
| Mill HouseShalford, Surrey | Whole-house refurbishmentDouble storey glass linked side extension, ground floor rear extension, full refurbishment with detached double garage | 10 months | 128 m² | |
| Rectory RoadFarnborough, Hampshire | Whole-house refurbishmentFull house refurbishment of this derelict 1930s property | 6 months | 40 m² | |
| CouchmoreEsher, Surrey | ExtensionModern ground floor extension | 10 weeks | 55 m² | |
| WaterdenGuildford, Surrey | Whole-house refurbishmentPart single storey, part double storey rear extension and full house renovation | 7 months | 133 m² | |
| Upper Orchard CloseBlackwater, Hampshire | ExtensionFirst floor side extension creating a new master bedroom, walk in wardrobe and large ensuite | 10 weeks | 35 m² | |
| SaddlewoodCamberley, Surrey | ExtensionGround floor rear extension and refurbishment of two existing bathrooms | 12 weeks | 30 m² | |
| Dagden RoadShalford, Surrey | Extension and loft conversionLoft conversion and glass link ground floor extension | 5 months | 90 m² | |
| Fleet RoadFarnborough, Hampshire | Extension and loft conversionBungalow conversion into a 5 bedroom, 3 bathroom detached property | 6 months | 114 m² | |
| GreenwaysEsher, Surrey | Whole-house refurbishmentGround floor kitchen extension, first floor side extension and full refurbishment throughout | 20 weeks | 110 m² | |
| Avondale AvenueEsher, Surrey | Whole-house refurbishmentFull house refurbishment, including loft and extension | 19 weeks | 108 m² | |
| The RiseFinchampstead, Berkshire | ExtensionSingle storey rear extension with double feature gables | 8 weeks | 45 m² | |
| Summer House CloseGodalming, Surrey | Whole-house refurbishmentFull house refurbishment of a 1950s bungalow, designed by Reigate Architects around a central courtyard | 19 weeks | 153 m² | |
| Firacre RoadAsh, Surrey | ExtensionExterior transformation, double storey front extension | 12 weeks | 26 m² | |
| Lattimer PlaceChiswick, London | ExtensionSingle storey rear kitchen extension | 9 weeks | 25 m² | |
| Claygate LaneThames Ditton, Surrey | Whole-house refurbishmentFull house refurbishment, loft conversion, side and rear extension | 18 weeks | 186 m² | |
| HolmwoodCranleigh, Surrey | ExtensionPart double storey, part single storey extension | 16 weeks | 21 m² | |
| Derwent RoadTwickenham, Middlesex | Whole-house refurbishmentFull renovation throughout including side and rear extension | 5 months | 28 m² | |
| Busbridge LaneGodalming, Surrey | Extension and loft conversionHip to gable rear dormer loft conversion and single storey ground floor extension | 14 weeks | 70.5 m² | |
| Townsgate FarmhouseMedstead, Hampshire | ExtensionRear extension to this Farmhouse in Hampshire | 10 weeks | 6 m² | |
| Manor Road SouthEsher, Surrey | Extension and loft conversionFirst floor front extension, double hip-to-gable loft conversion | 9 weeks | 75 m² |
Nothing matches both choices.
How to read these figures
As recorded
Each duration is the time on site as recorded for that project. Some were recorded in weeks and some in months. They are shown as recorded; where they are drawn, a month is taken as 4.3 weeks.
Floor area is the area added
For a new build it is the whole house. Work to the existing house is not measured by it, which is why a whole-house refurbishment takes longer than its added area suggests.
Not every project
24 of the 36 projects on this website have a recorded duration. The other 12 are left out, not estimated.
A record, not a quote
Ground, structure, specification and lead times differ on every job. Send us the drawings and we will talk through the programme for yours.
Let’s discuss your next project
If you’re looking for an experienced construction team for a substantial residential project, we’d welcome a conversation.
Share the location, scope and anticipated timescale, along with any drawings you have available. You’re also welcome to get in touch while the design is still developing.
01276 31317