Mr and Mrs Willis, from Kingston Upon Thames, contacted Marble Construction in May 2009 and asked us to come over and discuss their needs for an additional bedroom in the loft conversion.

When we met David and Samantha, they were expecting a baby in November and were desperate for an extra bedroom. Moving was not an option as their daughter was in a good school, they were both close to work and family and friends.

We discussed every possible option on how they could extend their house and fairly quickly they both decided to convert the space into a master bedroom with an additional bathroom.

When the preliminary plans were drawn it became apparent that the space could accommodate two double bedrooms and a bathroom fairly easily but, after re-evaluating, the wow factor master bedroom became the big dream they had set their mind on. We looked at the huge space and decided to include a large dressing room area so the room, once completed, would not be cluttered with wardrobes or cupboards.

The short time scale to complete the build and importance of meeting the deadlines was something that most companies would struggle to achieve. But with our experienced and dedicated team, we knew that we could do this.

The project started in October and was completed within an 8 week build schedule. Dave and Sam were fantastic customers to work with even under some very stressful time pressures. Sam said “I thought we had gone mad asking you guys to build such a big building project for us with so little time but you were courteous and respectful for our situation and were so clean I didn’t have to hoover for a month!”.

Dave and Sam asked us to finish all the additional bits and pieces such as the bathroom tiling, the hallway decoration and to arrange the fitting of the carpets. David said “It was a pleasure working with the Marble boys; they all knew the deadlines Sam and I were under and did everything possible to make sure they completed in time. The quality of our conversion was incredible. We are so impressed with their effort and determination we would recommend them to anyone!’

David and Sam had a beautiful little girl called Maddison in late November and also attended our Christmas party in 2009.

Dave and Sam have went on to hire Marble Construction to build their rear kitchen extension in spring 2010.

For more information,  please see our main page on loft conversions or contact us.

You must be logged in to post a comment.